Our website includes a few examples of our over 180 projects completed since NovelE's inception. For a more detailed look at our project portfolio, please check out our detailed Statement of Qualifications using the link below.
|
USACE, LOUISVILLE DISTRICT
FY21 WATER QUALITY DATA PROJECT BY THE NUMBERS: Acres of Reservoirs Sampled: 84,630 pH Readings Collected: 3,577 Total Data Readings: 71,540 Zoological samples collected: 285 Total Water Samples collected: 2,626 NovelE conducted surface water sampling to support the Water Quality Team objectives of the Louisville District Water Quality Program. NovelE was contracted by the U.S. Army Corps of Engineers (USACE), Louisville District, to complete work activities consisting of four major components including scheduling, aquatic physical/chemical/biological data and sample collection, quality control, and reporting at 18 District reservoirs spanning from Ohio, Kentucky and Indiana. |
UNITED STATES DEPARTMENT OF VETERAN'S AFFAIRS
BAY PINES VA HEALTHCARE SYSTEM REMEDIATION SERVICES IDIQ NovelE is the Engineer-of-Record and Geologist-of-Record to the United States Department of Veteran’s Affairs for environmental consulting services at their Bay Pines Healthcare System. The Bay Pines Healthcare system consists of 9 facilities along the western coast of Florida. Liza Grudin, PE serves as the registered engineer for this fast-tracked compliance and site rehabilitation projects. Gregory Aumann, Project Geologist, provides the primary project management and field oversight for site activities. NovelE is a key subcontractor on this 5-year, $4.16 million IDIQ to our SDVOSB teaming partner. Services include Planning, Permitting and Compliance, Contamination Assessment, Soil Sampling, Groundwater Sampling, Free Product Recovery, Source Removal, Risk Management, and SPCC development. |
MIAMI DADE COUNTY CIVIL & PROBATE COURTHOUSE
NovelE provided technical, engineering and construction feasibility support for this County‐owned project. The project site was previously a public park with a small parking lot. The proposed redevelopment plan includes the construction of a Civil and Probate Courthouse with associated amenities. A six‐foot deep parking basement will be constructed with a concrete foundation mat approximately 9 feet thick below the basement. NovelE conducted the environmental sample collection, analysis and evaluation and incorporated the findings into the Remedial Action Plan (RAP). For this scope of work, the RAP takes the form of a Soil Management Plan (SMP) defining procedures to manage arsenic‐ and lead‐impacted soil and groundwater so construction activities will be protective of human health and the environment. NovelE conducted the environmental sample collection, analysis and evaluation and incorporated the findings into the Remedial Action Plan (RAP). For this scope of work, the RAP takes the form of a Soil Management Plan (SMP) defining procedures to manage arsenic‐ and lead‐impacted soil and groundwater so construction activities will be protective of human health and the environment. |
SFWMD SEGMENT 3 PUMP CLOSURE NovelE conducted environmental consulting services as a Prime Contractor to the South Florida Water Management District (SFWMD). The goal of the assessment and source removal activities was to obtain closure of the April 26, 1999 discharge from an aboveground storage tank (AST) within 2 months timeframe. Site activities were conducted at the Segment 3 Pump Station in order to facilitate construction work for the Everglades Restoration Program. The Segment 3 Pump Station site was a former pump station that had an AST. In June 2021, NovelE supervised excavation activities. After the removal of the concrete slabs, NovelE collected soil samples. Additionally, three monitoring wells were installed and groundwater samples were collected for laboratory analysis. Based on the analysis, the samples met the Soil Cleanup Target Levels (SCTLs) and Groundwater Cleanup Target Levels (GCTLs) as defined by Chapter 62‐777, FAC, respectively. |